Shutdown and Flange Management of LPG Plants
- Operation and Maintenance
Supply Copper Slag Material
- Supply & Manufucturing
Supply Electrical and Earthing system equipment and material
- Supply & Manufucturing
Supply 3PLE Coating Material
- Supply & Manufucturing
Supply Red & Almandine Garnet
- Supply & Manufucturing
Design, Manufucturing and installation of 630KVA AVR system
- Supply & Manufucturing
Scaffolding of Plant and Vessels
- Insulation & Jackets
Design and Supply AeroGel Jackets Turbo Pipe of Gas Compressor
- Insulation & Jackets
Design and Supply of AeroGel Jackets for Exhaust Silencers
- Insulation & Jackets
HPWJ Cleaning of Separator Vessel
- Professional Cleaning Services
Chemical Cleaning and HWJ Cleaning of Heat Exchangers
- Professional Cleaning Services
Dry Ice Blasting of Gas Compressors Cooler Fin plates
- Professional Cleaning Services
Electrical Survey and Load Asbuilt
- Special Engineering
Design, Manufucturing and Installation of ATS system
- Supply & Manufucturing
Early Water Facility Asbuilt and Re-Design
- Special Engineering
Master Ex Register and Ex Inspection in Zone CryoGen #1 and Fz5/5.1
- Special Engineering
Master Ex Register and Ex Inspection in Zone 6 & 8
- Special Engineering
Basic Engineering of FM-200 and 3D Modeling of Control Rooms
- Special Engineering
Depth measurement and underground Survey of 19 Defects along KPC Pipeline
- Special Engineering
Provide Manpower and Engineering Service
- Special Engineering
Topographical Survey and Design of 10.32 KM Water flowlines.
- Special Engineering
3D Modeling of 7 Gas Wells
- Special Engineering
Topo Survey of Sludge Pond
- Special Engineering
Water Wells and Flowlines Survey
- Special Engineering
Static and Structural Maintenance of KPC Stations
- Operation and Maintenance
Defect Rectification of Insulation & Cladding
- Insulation & Jackets
Rectification of CAT-3 Defects
- Operation and Maintenance
Vibration Analysis and Dynamic Balance
- Operation and Maintenance
Air Cooling System Overhaul
- Professional Cleaning Services