Flange Management of LPG Plants

The project covers comprehensive flange management activities during shutdown, including documentation control, installation of flange tag numbers, inspection and verification of flange assembly and bolt torquing, final checking and tag collection, leak testing, and preparation of final reports. The scope applies to both new piping and equipment (engineering works) as well as maintenance activities, ensuring flange integrity, traceability, and safe and reliable startup.
  • April 30, 2025
  • Operation and Maintenance

Scaffolding of Plant and Vessels

Transferring and installing scaffolding in the required areas to provide safe access for equipment inspection.
  • December 15, 2025
  • Operation and Maintenance

Static and Structural Maintenance

This project involves the static and structural maintenance works at specific Stations, including the fabrication, supply, and installation of steel structural components required for station facilities. The scope covers structural repair, reinforcement, and installation of new steel structures to ensure the integrity and safe operation of station infrastructure. Works include fabrication of structural steel members, surface preparation and protective coating, transportation to site, and installation in accordance with approved engineering drawings and applicable standards. The activities aim to maintain the structural stability, reliability, and operational safety of the station facilities.
  • December 18, 2020
  • Operation and Maintenance

Rectification of CAT-3 Defects

This project involves the engineering and design, procurement, fabrication, and installation of access platforms at site to provide safe and reliable access for operation, inspection, and maintenance activities, in accordance with approved drawings and site requirements.
  • June 30, 2023
  • Operation and Maintenance

Vibration Analysis and Dynamic Balance

The project involves vibration measurement, mechanical condition assessment, and dynamic balancing of the blower, including diagnosis of bearing and alignment issues, rotor balancing, post-startup measurements, and issuance of a technical report with maintenance recommendations.
  • September 10, 2024
  • Operation and Maintenance