Shutdown and Flange Management of LPG Plants Supply Copper Slag Material Supply Electrical and Earthing system equipment and material Supply 3PLE Coating Material Supply Red & Almandine Garnet Design, Manufucturing and installation of 630KVA AVR system Scaffolding of Plant and Vessels Modification and Installation of Insulation and Cladding of Amine Unit and Still Tower Design and Supply AeroGel Jackets Turbo Pipe of Gas Compressor Design and Supply of AeroGel Jackets for Exhaust Silencers HPWJ Cleaning of Separator Vessel Chemical Cleaning and HWJ Cleaning of Heat Exchangers Dry Ice Blasting of Gas Compressors Cooler Fin plates Electrical Survey and Load Asbuilt Design, Manufucturing and Installation of ATS system Early Water Facility Asbuilt and Re-Design Master Ex Register and Ex Inspection in Zone CryoGen #1 and Fz5/5.1 Master Ex Register and Ex Inspection in Zone 6 & 8 Basic Engineering of FM-200 and 3D Modeling of Control Rooms Depth measurement and underground Survey of 19 Defects along KPC Pipeline Provide Manpower and Engineering Service Topographical Survey and Design of 10.32 KM Water flowlines. Topographical, Geotechnical, Archeological and Geological Services and Design of 14 KM flowlines 3D Modeling of 7 Gas Wells Topo Survey of Sludge Pond Water Wells and Flowlines Survey Static and Structural Maintenance of KPC Stations Defect Rectification of Insulation & Cladding Rectification of CAT-3 Defects Vibration Analysis and Dynamic Balance Air Cooling System Overhaul