Shutdown and Flange Management of LPG Plants

The project covers comprehensive flange management activities during shutdown, including documentation control, installation of flange tag numbers, inspection and verification of flange assembly and bolt torquing, final checking and tag collection, leak testing, and preparation of final reports. The scope applies to both new piping and equipment (engineering works) as well as maintenance activities, ensuring flange integrity, traceability, and safe and reliable startup.

  • Operation and Maintenance
  • April 30, 2025